Australian Capital Territory

coin-icon

ACT Government

calendar-icon

September 2012 - June 2013

coin-icon

$3.6 million

stopwatch-icon

Complete


Scope

The scope of work included:

  • design and construction of the refuelling and environmental controls of two bud depots
  • replacement of the aboveground diesel tanks at Belconnen with two 80,000 litre tanks including new foundations, extension of bunding, installation of a major roof structure, and a spel puraceptor for the oily water separation
  • installation of new tanker unloading facilities at both sites with remote tank selection and automatic high level shutoffs
  • replacement of all bowers in order to include sumps and electronic heads allowing data capture and authorisation control
  • upgrading the waste oil facilities to ensure correct environmental controls including automatic overfill protection
  • replacement of the fuel delivery lines and delivery pumps as well as instrumentation at Belconnen.

Outcomes

The project team was flexible in their approach, accommodating late changes and additions to the original scope. The design process was expediated by continuously liaising with the client throughout the project. Transparent and consistent communication with suppliers resulted in minimal delays across the delivery of components and installation of structures.