Scope
The scope of work included:
- clearing and demolition works
- earthworks involving cut and fill
- relocation of land fill waste
- construction and installation of 10 tennis courts and two interchangeable sport courts
- construction of 8000m2, 150 millimetre thick suspended concrete slab
- installation of 540 steel, concrete filled driven piles
- installation of gabion retaining wall
- installation of all stormwater, water and electrical services
- installation of 12 light poles and switchboard
- installation court ancillary items including fencing, netting, asphalt, plexipave, line marking, shade shelters, and drinking fountains.
Outcomes
During construction, the team placed a heavy focus on the environmental aspects of the project, as the construction site was located on top of a redundant landfill site. The complex earthworks on contaminated land were performed with no noise, dust, or water contaminants leaving the site or affecting workers or the public.