Queensland

coin-icon

Springfield City Group

calendar-icon

July 2019 – June 2020

coin-icon

$8.1 million

stopwatch-icon

Complete

Scope

The scope of work included:

  • bulk earthworks including 246,500m3 of cut and 106,425m3 of fill
  • construction of 7190m2 of asphalt pavements
  • construction of Brookwater South trunk sewer consisting of 390 metres of – 400 millimetres in diameter PE pipes
  • installation of 460 metres of 450 millimetres in diameter DICL pipes on Eden Station Drive
  • installation of 600 metres of trunk stormwater diversion drainage, including the design and installation of two precast stormwater chambers and various reinforced concrete pipes ranging in size from 1350 millimetres in diameter to 1800 millimetres in diameter
  • design and construction of a 150m2 sandstone retaining wall.

Outcomes

During site inspections and prior to commencing works onsite, BMD encountered almost 300 fire ant nests which presented a significant environmental hazard. To mitigate the risks associated with these nests, the site was treated prior to project commencement. The project team continued to remain vigilant throughout works, particularly during movement of material, ensuring any nests found were treated as soon as possible and reported to the Department of Agriculture and Fisheries.

BMD encountered safety challenges towards the end of the project, due to the COVID-19 pandemic outbreak. Through effective planning and a collaborative team culture, BMD successfully implemented social distancing and hygiene practices to ensure the safety of all personnel whilst also achieving commercial and programming targets.