Scope

The scope of work included:

  • demolition of existing pavements and structures
  • installation of approximately 3700m2 of exposed aggregate pavements
  • 350m3 of coloured concrete to provide a new beach access terraced stairway
  • 3000m2 of new lawn area
  • construction of a central reflection pool water feature and interactive beach showers
  • installation of custom furniture including ripple lounge and flotsam seats
  • new ablutions building
  • installation of new structural steel shelters
  • reconfigured and resurfaced north and south car parks.

Outcomes

Through a value management process, BMD Urban saved over $800,000 and completed the project lost time injury free.

Minimising potential inconvenience to local business, adjoining property and the public was one of BMD Urban’s primary concerns. Work was scheduled by BMD Urban to ensure construction impacts were minimised for local retailers, beachgoers and stakeholders. The project was successfully programmed and completed in the winter months to ensure it was opened prior to the busy summer trading period.

BMD Urban were extremely cautious of the proximity of the site to the ocean and during construction successfully ensured there were no environmental incidents. This led to BMD Urban winning the 2016 Civil Contractors Federation SA Earth Award for Excellence in Civil Construction – Category 3.